Replacement dwelling in Green Belt

6 July 2026

The MEP team was instructed to secure permission for a replacement dwelling and ancillary buildings within the ๐—ช๐—ฒ๐˜€๐˜ ๐— ๐—ถ๐—ฑ๐—น๐—ฎ๐—ป๐—ฑ๐˜€ ๐—š๐—ฟ๐—ฒ๐—ฒ๐—ป ๐—•๐—ฒ๐—น๐˜. Whilst this project may have initially been viewed as a straightforward farmhouse replacement, the reality was far more nuanced.

The proposals involved the demolition of two non-designated ๐—ต๐—ฒ๐—ฟ๐—ถ๐˜๐—ฎ๐—ด๐—ฒ ๐—ฎ๐˜€๐˜€๐—ฒ๐˜๐˜€ and the new dwelling represented an increase of around 30% over the size of the existing dwelling, which significantly exceeded the local policy threshold of 20%. As such, the scheme may have been considered as inappropriate development in the Green Belt whilst also attracting heritage objections therefore representing policy conflict from the outset.
ย 
However, MEP successfully demonstrated that the proposals should be assessed against the site’s lawful and realistic baseline, highlighting the opportunity to comprehensively redevelop the existing developed core rather than considering the farmhouse in isolation. By carefully presenting the planning history and the wider context of the site, whilst demonstrating a full understanding of the historic significance of the site, the MEP team was able to show that the proposals represented a coherent and considered redevelopment of the farmstead, resulting in a positive outcome for our client.
ย 
The MEP team worked proactively with Wyre Forest District Council to obtain the positive result which was unanimously approved at Committee.
ย 
Another rewarding project demonstrating that even the most nuanced planning cases can achieve a positive outcome with the right approach.

Other News

Replacement dwelling in Green Belt

The MEP team was instructed to secure permission for a replacement dwelling and ancillary buildings within the ๐—ช๐—ฒ๐˜€๐˜ ๐— ๐—ถ๐—ฑ๐—น๐—ฎ๐—ป๐—ฑ๐˜€ ๐—š๐—ฟ๐—ฒ๐—ฒ๐—ป ๐—•๐—ฒ๐—น๐˜. Whilst this project may have initially been viewed as a straightforward farmhouse replacement, the reality was far more nuanced. The proposals involved the demolition of two non-designated ๐—ต๐—ฒ๐—ฟ๐—ถ๐˜๐—ฎ๐—ด๐—ฒ ๐—ฎ๐˜€๐˜€๐—ฒ๐˜๐˜€ and the new dwelling represented […]

Consent obtained for the refurbishment of Grade II* listed building on behalf of Renishaw.

Listed Building Consent has been obtained for the refurbishment of the primary office building for Renishaw at Wotton Under Edge. New Mills is an impressive Grade II* listed building dating back from the early (19th. Currently used as offices, the building is in need for significant internal upgrades. The approved scheme represents substantial additional investment […]

Appeal win with a full award of costs

Planning permission has been secured on appeal for to replace a live/work unit with an open market dwelling at Blackberry Barn, Bredonโ€™s Norton, South Worcestershire.ย  The proposal was for the replacement of a live/work unit with an open market dwelling, reflecting an extant permission. Planning permission had been granted for the replacement dwelling in 2021, […]